Company 62 made a full department response to a large fire in a lumber storage building in the 61first due. Upon arrival crews found a large volume of fire throughout the building with multiple other buildings in danger, E62-2 arrived as the second arriving engine and took the Delta side of the structure with their own water source and put multiple hose lines into service on the fire building. The 62 units operated on this incident for approximately 9 hours.